A day in the life
- Walk the line to spot bottlenecks, safety risks, and quality issues from the last shift
- Review production data, scrap reports, and downtime logs; pick top problems to attack
- Run a small test on the floor, measure results, and adjust the process settings
- Meet with quality and design to approve a change and update drawings and instructions
- Document the change, train operators, and track results for the next few days
Tools you will use