A day in the life
- Check rainfall, flow, and survey data, then update a model run
- Draft a drainage plan and review it with a project engineer
- Meet with permitting staff to confirm requirements and timelines
- Visit a site to inspect erosion controls and take photos and notes
- Write a short report and send design updates to the wider team
Tools you will use